{"id":2272,"date":"2026-07-06T12:16:02","date_gmt":"2026-07-06T09:16:02","guid":{"rendered":"https:\/\/ilida-eng.gr\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\/"},"modified":"2026-07-06T12:16:02","modified_gmt":"2026-07-06T09:16:02","slug":"new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia","status":"publish","type":"post","link":"https:\/\/ilida-eng.gr\/en\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\/","title":{"rendered":"New commission: Inventory study of the existing road network in the Regional Units of Achaia and Ilia"},"content":{"rendered":"<p>Following the signing of a contract with the Technical Chamber of Greece (TEE), ILIDA Consulting Engineers SA has undertaken the study for recording the existing road network of the country in the Regional Units of Achaia and Ilia.<\/p>\n<h2 class=\"wp-block-heading\">Scope<\/h2>\n<p>The object of the study is the recording of the existing road network per Municipal Unit, in areas outside city street plans, outside the boundaries of settlements legally existing before 1923 and of settlements with up to 2,000 inhabitants. The study forms part of the Independent Studies for the Classification of Municipal Roads and will serve as the basis for the ratification of the public municipal road network by the competent Decentralised Administration.<\/p>\n<p>Implementation proceeds in three stages: recording and analysis of requirements with data collection; mapping and vectorisation of the entire road network; and analysis with classification of the unrecognised network outside approved street plans and delimited settlements.<\/p>\n<h2 class=\"wp-block-heading\">Project details<\/h2>\n<ul class=\"wp-block-list\">\n<li>Contracting Authority: Technical Chamber of Greece (TEE)<\/li>\n<li>Study category: Surveying Studies (category 16)<\/li>\n<li>Area: Regional Units of Achaia and Ilia<\/li>\n<li>Maximum contract value: \u20ac7,944,660.00 (plus VAT)<\/li>\n<li>Duration: five (5) months<\/li>\n<\/ul>\n<h2 class=\"wp-block-heading\">Funding<\/h2>\n<p>The project is implemented within the National Recovery and Resilience Plan &#8220;Greece 2.0&#8221;, funded by the European Union \u2013 NextGenerationEU.<\/p>\n<p>Undertaking this project confirms ILIDA&#8217;s experience and expertise in surveying, digital mapping and large-scale infrastructure inventory studies, strengthening the company&#8217;s contribution to projects with a significant developmental and institutional footprint for Local Government.<\/p>\n","protected":false},"excerpt":{"rendered":"Following the signing of a contract with the Technical Chamber of Greece (TEE), ILIDA Consulting Engineers SA has undertaken the study for recording the existing road network of the country in the Regional Units of Achaia and Ilia. Scope The object of the study is the recording of the existing road network per Municipal Unit, in areas outside city street plans, outside the boundaries of settlements legally existing before 1923 and of settlements with up to 2,000 inhabitants. The study [&hellip;]","protected":false},"author":1,"featured_media":2194,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_links_to":"","_links_to_target":""},"categories":[21,24],"tags":[],"class_list":["post-2272","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-topography-gis"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>New commission: Inventory study of the existing road network in the Regional Units of Achaia and Ilia - \u0397\u039b\u0399\u0394\u0391 - \u03a3\u03a5\u039c\u0392\u039f\u03a5\u039b\u039f\u0399 \u039c\u0397\u03a7\u0391\u039d\u0399\u039a\u039f\u0399 \u0391.\u0395.<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ilida-eng.gr\/en\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"New commission: Inventory study of the existing road network in the Regional Units of Achaia and Ilia - \u0397\u039b\u0399\u0394\u0391 - \u03a3\u03a5\u039c\u0392\u039f\u03a5\u039b\u039f\u0399 \u039c\u0397\u03a7\u0391\u039d\u0399\u039a\u039f\u0399 \u0391.\u0395.\" \/>\n<meta property=\"og:description\" content=\"Following the signing of a contract with the Technical Chamber of Greece (TEE), ILIDA Consulting Engineers SA has undertaken the study for recording the existing road network of the country in the Regional Units of Achaia and Ilia. Scope The object of the study is the recording of the existing road network per Municipal Unit, in areas outside city street plans, outside the boundaries of settlements legally existing before 1923 and of settlements with up to 2,000 inhabitants. The study [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ilida-eng.gr\/en\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\/\" \/>\n<meta property=\"og:site_name\" content=\"\u0397\u039b\u0399\u0394\u0391 - \u03a3\u03a5\u039c\u0392\u039f\u03a5\u039b\u039f\u0399 \u039c\u0397\u03a7\u0391\u039d\u0399\u039a\u039f\u0399 \u0391.\u0395.\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-06T09:16:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ilida-eng.gr\/wp-content\/uploads\/2026\/09\/opt-1508.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"1500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"inkadmin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"inkadmin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\\\/\"},\"author\":{\"name\":\"inkadmin\",\"@id\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/#\\\/schema\\\/person\\\/f466d70d4c56c89fc085a2b69cf9669d\"},\"headline\":\"New commission: Inventory study of the existing road network in the Regional Units of Achaia and Ilia\",\"datePublished\":\"2026-07-06T09:16:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\\\/\"},\"wordCount\":246,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ilida-eng.gr\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/opt-1508.jpg\",\"articleSection\":[\"News\",\"Topography - GIS\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\\\/\",\"url\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\\\/\",\"name\":\"New commission: Inventory study of the existing road network in the Regional Units of Achaia and Ilia - \u0397\u039b\u0399\u0394\u0391 - \u03a3\u03a5\u039c\u0392\u039f\u03a5\u039b\u039f\u0399 \u039c\u0397\u03a7\u0391\u039d\u0399\u039a\u039f\u0399 \u0391.\u0395.\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ilida-eng.gr\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/opt-1508.jpg\",\"datePublished\":\"2026-07-06T09:16:02+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ilida-eng.gr\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/opt-1508.jpg\",\"contentUrl\":\"https:\\\/\\\/ilida-eng.gr\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/opt-1508.jpg\",\"width\":1200,\"height\":1500},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0391\u03c1\u03c7\u03b9\u03ba\u03ae\",\"item\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"New commission: Inventory study of the existing road network in the Regional Units of Achaia and Ilia\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/\",\"name\":\"\u0397\u039b\u0399\u0394\u0391 - \u03a3\u03a5\u039c\u0392\u039f\u03a5\u039b\u039f\u0399 \u039c\u0397\u03a7\u0391\u039d\u0399\u039a\u039f\u0399\",\"description\":\"\u03a4\u03b5\u03c7\u03bd\u03b9\u03ba\u03ae \u039c\u03b5\u03bb\u03b5\u03c4\u03b7\u03c4\u03b9\u03ba\u03ae \u0395\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b1\",\"publisher\":{\"@id\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/#organization\",\"name\":\"\u0397\u039b\u0399\u0394\u0391 - \u03a3\u03a5\u039c\u0392\u039f\u03a5\u039b\u039f\u0399 \u039c\u0397\u03a7\u0391\u039d\u0399\u039a\u039f\u0399\",\"url\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/ilida-eng.gr\\\/wp-content\\\/uploads\\\/2021\\\/05\\\/cropped-logo.png\",\"contentUrl\":\"https:\\\/\\\/ilida-eng.gr\\\/wp-content\\\/uploads\\\/2021\\\/05\\\/cropped-logo.png\",\"width\":299,\"height\":76,\"caption\":\"\u0397\u039b\u0399\u0394\u0391 - \u03a3\u03a5\u039c\u0392\u039f\u03a5\u039b\u039f\u0399 \u039c\u0397\u03a7\u0391\u039d\u0399\u039a\u039f\u0399\"},\"image\":{\"@id\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/ilida-consulting-engineers-sa\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/#\\\/schema\\\/person\\\/f466d70d4c56c89fc085a2b69cf9669d\",\"name\":\"inkadmin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/abfdec9ee996377d62729bcbc63ee2c2b74b32e23fbf3dd40297b498d51dfa7c?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/abfdec9ee996377d62729bcbc63ee2c2b74b32e23fbf3dd40297b498d51dfa7c?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/abfdec9ee996377d62729bcbc63ee2c2b74b32e23fbf3dd40297b498d51dfa7c?s=96&d=mm&r=g\",\"caption\":\"inkadmin\"},\"sameAs\":[\"https:\\\/\\\/ilida-eng.gr\"],\"url\":\"https:\\\/\\\/ilida-eng.gr\\\/en\\\/author\\\/inkadmin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"New commission: Inventory study of the existing road network in the Regional Units of Achaia and Ilia - \u0397\u039b\u0399\u0394\u0391 - \u03a3\u03a5\u039c\u0392\u039f\u03a5\u039b\u039f\u0399 \u039c\u0397\u03a7\u0391\u039d\u0399\u039a\u039f\u0399 \u0391.\u0395.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ilida-eng.gr\/en\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\/","og_locale":"en_US","og_type":"article","og_title":"New commission: Inventory study of the existing road network in the Regional Units of Achaia and Ilia - \u0397\u039b\u0399\u0394\u0391 - \u03a3\u03a5\u039c\u0392\u039f\u03a5\u039b\u039f\u0399 \u039c\u0397\u03a7\u0391\u039d\u0399\u039a\u039f\u0399 \u0391.\u0395.","og_description":"Following the signing of a contract with the Technical Chamber of Greece (TEE), ILIDA Consulting Engineers SA has undertaken the study for recording the existing road network of the country in the Regional Units of Achaia and Ilia. Scope The object of the study is the recording of the existing road network per Municipal Unit, in areas outside city street plans, outside the boundaries of settlements legally existing before 1923 and of settlements with up to 2,000 inhabitants. The study [&hellip;]","og_url":"https:\/\/ilida-eng.gr\/en\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\/","og_site_name":"\u0397\u039b\u0399\u0394\u0391 - \u03a3\u03a5\u039c\u0392\u039f\u03a5\u039b\u039f\u0399 \u039c\u0397\u03a7\u0391\u039d\u0399\u039a\u039f\u0399 \u0391.\u0395.","article_published_time":"2026-07-06T09:16:02+00:00","og_image":[{"width":1200,"height":1500,"url":"https:\/\/ilida-eng.gr\/wp-content\/uploads\/2026\/09\/opt-1508.jpg","type":"image\/jpeg"}],"author":"inkadmin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"inkadmin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ilida-eng.gr\/en\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\/#article","isPartOf":{"@id":"https:\/\/ilida-eng.gr\/en\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\/"},"author":{"name":"inkadmin","@id":"https:\/\/ilida-eng.gr\/en\/#\/schema\/person\/f466d70d4c56c89fc085a2b69cf9669d"},"headline":"New commission: Inventory study of the existing road network in the Regional Units of Achaia and Ilia","datePublished":"2026-07-06T09:16:02+00:00","mainEntityOfPage":{"@id":"https:\/\/ilida-eng.gr\/en\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\/"},"wordCount":246,"commentCount":0,"publisher":{"@id":"https:\/\/ilida-eng.gr\/en\/#organization"},"image":{"@id":"https:\/\/ilida-eng.gr\/en\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\/#primaryimage"},"thumbnailUrl":"https:\/\/ilida-eng.gr\/wp-content\/uploads\/2026\/09\/opt-1508.jpg","articleSection":["News","Topography - GIS"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/ilida-eng.gr\/en\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/ilida-eng.gr\/en\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\/","url":"https:\/\/ilida-eng.gr\/en\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\/","name":"New commission: Inventory study of the existing road network in the Regional Units of Achaia and Ilia - \u0397\u039b\u0399\u0394\u0391 - \u03a3\u03a5\u039c\u0392\u039f\u03a5\u039b\u039f\u0399 \u039c\u0397\u03a7\u0391\u039d\u0399\u039a\u039f\u0399 \u0391.\u0395.","isPartOf":{"@id":"https:\/\/ilida-eng.gr\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ilida-eng.gr\/en\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\/#primaryimage"},"image":{"@id":"https:\/\/ilida-eng.gr\/en\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\/#primaryimage"},"thumbnailUrl":"https:\/\/ilida-eng.gr\/wp-content\/uploads\/2026\/09\/opt-1508.jpg","datePublished":"2026-07-06T09:16:02+00:00","breadcrumb":{"@id":"https:\/\/ilida-eng.gr\/en\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ilida-eng.gr\/en\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ilida-eng.gr\/en\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\/#primaryimage","url":"https:\/\/ilida-eng.gr\/wp-content\/uploads\/2026\/09\/opt-1508.jpg","contentUrl":"https:\/\/ilida-eng.gr\/wp-content\/uploads\/2026\/09\/opt-1508.jpg","width":1200,"height":1500},{"@type":"BreadcrumbList","@id":"https:\/\/ilida-eng.gr\/en\/new-commission-inventory-study-of-the-existing-road-network-in-the-regional-units-of-achaia-and-ilia\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0391\u03c1\u03c7\u03b9\u03ba\u03ae","item":"https:\/\/ilida-eng.gr\/en\/"},{"@type":"ListItem","position":2,"name":"New commission: Inventory study of the existing road network in the Regional Units of Achaia and Ilia"}]},{"@type":"WebSite","@id":"https:\/\/ilida-eng.gr\/en\/#website","url":"https:\/\/ilida-eng.gr\/en\/","name":"\u0397\u039b\u0399\u0394\u0391 - \u03a3\u03a5\u039c\u0392\u039f\u03a5\u039b\u039f\u0399 \u039c\u0397\u03a7\u0391\u039d\u0399\u039a\u039f\u0399","description":"\u03a4\u03b5\u03c7\u03bd\u03b9\u03ba\u03ae \u039c\u03b5\u03bb\u03b5\u03c4\u03b7\u03c4\u03b9\u03ba\u03ae \u0395\u03c4\u03b1\u03b9\u03c1\u03b5\u03af\u03b1","publisher":{"@id":"https:\/\/ilida-eng.gr\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ilida-eng.gr\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ilida-eng.gr\/en\/#organization","name":"\u0397\u039b\u0399\u0394\u0391 - \u03a3\u03a5\u039c\u0392\u039f\u03a5\u039b\u039f\u0399 \u039c\u0397\u03a7\u0391\u039d\u0399\u039a\u039f\u0399","url":"https:\/\/ilida-eng.gr\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ilida-eng.gr\/en\/#\/schema\/logo\/image\/","url":"https:\/\/ilida-eng.gr\/wp-content\/uploads\/2021\/05\/cropped-logo.png","contentUrl":"https:\/\/ilida-eng.gr\/wp-content\/uploads\/2021\/05\/cropped-logo.png","width":299,"height":76,"caption":"\u0397\u039b\u0399\u0394\u0391 - \u03a3\u03a5\u039c\u0392\u039f\u03a5\u039b\u039f\u0399 \u039c\u0397\u03a7\u0391\u039d\u0399\u039a\u039f\u0399"},"image":{"@id":"https:\/\/ilida-eng.gr\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/ilida-consulting-engineers-sa"]},{"@type":"Person","@id":"https:\/\/ilida-eng.gr\/en\/#\/schema\/person\/f466d70d4c56c89fc085a2b69cf9669d","name":"inkadmin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/abfdec9ee996377d62729bcbc63ee2c2b74b32e23fbf3dd40297b498d51dfa7c?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/abfdec9ee996377d62729bcbc63ee2c2b74b32e23fbf3dd40297b498d51dfa7c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/abfdec9ee996377d62729bcbc63ee2c2b74b32e23fbf3dd40297b498d51dfa7c?s=96&d=mm&r=g","caption":"inkadmin"},"sameAs":["https:\/\/ilida-eng.gr"],"url":"https:\/\/ilida-eng.gr\/en\/author\/inkadmin\/"}]}},"_links":{"self":[{"href":"https:\/\/ilida-eng.gr\/en\/wp-json\/wp\/v2\/posts\/2272","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ilida-eng.gr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ilida-eng.gr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ilida-eng.gr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ilida-eng.gr\/en\/wp-json\/wp\/v2\/comments?post=2272"}],"version-history":[{"count":0,"href":"https:\/\/ilida-eng.gr\/en\/wp-json\/wp\/v2\/posts\/2272\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ilida-eng.gr\/en\/wp-json\/wp\/v2\/media\/2194"}],"wp:attachment":[{"href":"https:\/\/ilida-eng.gr\/en\/wp-json\/wp\/v2\/media?parent=2272"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ilida-eng.gr\/en\/wp-json\/wp\/v2\/categories?post=2272"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ilida-eng.gr\/en\/wp-json\/wp\/v2\/tags?post=2272"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}