Within the framework of the above study, landslide remediation measures were designed for the road section in question, which included, among others:
- Construction of Ø800 piles, 11 m long, at 2 m spacing, connected by a 1.0×1.0 m pile cap beam.
- Placement of geotextile at the base of the embankments.
- Construction of gabions measuring 1.0×1.0×2.0 m (w×h×l).